August 2003 - Summary of Blade Wire Clamp testing . (pdf)

June 2003 -
Updated results with new GEO blades (lapped) and with final blade wire clamp tests complete - report to follow.

December 2002:
Photos of blade clamp, eddy current damper and blade testing completed by myself, Russell Jones (IGR) and Calum Torrie (LIGO) during his recent visit to Glasgow. Results of these tests will be posted once all testing is completed in January. Results of Blade/Blade Clamp/Blade Wire Clamp Testing
Click for larger images.

Blade Clamp Testing: Normal blade clamp

1 1

Blade Clamp Testing: Rounded blade clamp

7 2 8 3 9 4

Blade Clamp Testing - Rounded Blade Clamp with Knife Edge

10 5 11 6
12 7 12 8

Blade testing SUMMARY DOCUMENT EXPLAINING THE RESULTS OF GEO BLADE TESTING

6 9 2 10 14 11

Eddy Current Damper Testing

Eddy Current Damper on Glasgow Triple12 Eddy Current Damper 13 Eddy Current Damper 14

Overall summary of work completed during the visit of Dr Calum Torrie