Crib page for PiP/TOF 2001 experiments


This web page is a source of information relevant to the PiP/TOF experiments at the MAMI-B electron beam accelerator at Mainz in 2001.

The setup

  • The experimental proposal  [postscript]
  • Experimental layout  [postscript]
  • Preliminary !! Circuit diagram of PiP-TOF trigger  [postscript]
  • Preliminary !! Circuit diagram for TOF supplement  [postscript]
  • Preliminary !! Circuit diagram for TAGGER supplement  [postscript]

  •  

    Latest info

     Tasks for first PiP/TOF beam time - Jan 24th-28th
     Results from test of PiP with cosmics - July 2001

    Shiftworkers crib sheets

    The links below give crib sheets for carrying out some standard procedures expected during run time. To modify the crib sheets copy the HTML file to your local disk (by right clicking the mouse on the link), then edit the HTML file. You can do this by either editing the raw HTML file in an editor (eg Xemacs) or by using a HTML editor (eg. Netscape composer). Then send the modified file as an attachment to d.watts@physics.gla.ac.uk and the updated crib will be put on the web server.
     

    Acquisition

    Overview
    Acqu Manual postscript   4 per page postscript
    What to write in run log book
    How to obtain a scaler dump
    How to use the ACQU Graphical User Interface (XControl)
    Routine running of acquisition
    What are the scaler numbers?
    How to check the spectra
    Very Crucial Spectra
    Crucial Spectra
    PiP/TOF TDC spectra
    PiP/TOF QDC spectra
    The tagger spectra
    How to copy data to DLT tape
    How to edit files on deepthought

    MAMI

    Overview
    Safety
    Opening the hall
    Contact the MAMI operator
    Closing the hall
    beam parameters
    Beam Optimization

    PiP

    How to relate PiP detectors to the corresponding QDC/TDC
    How to change the voltages on the PiP detectors

    TOF

    How to relate TOF detectors to the corresponding QDC/TDC
    How to change the voltages on the TOF detectors

    Tagger

     How to carry out a measurement of tagging efficiency
     Moving the Lead Glass detector in or out of beamline
     Adjusting the Lead Glass detector into the beamline
     Switching on the lead glass HV
     Evacuating the tagger
     Checking the vacuum
     Opening the last beamline valve in fromt of the tagger
     Removing Radioactive Sources and other Parasites from the Tagger
     Handling the tagger pulser
     Operating the photon TV
     Tagger HV

    Helium Target


     Operators bible
     

    Water target

     Outline
     Pictures
     

    Automated Target Changer


     Operators bible
     

    Calculations

    Calculations and simulations relevant to the experiment.  [HTML]
    He4(g,pp) calculations using 2N model for theta_p=60 +/- 3 degrees @ Eg=550 MeV  [postscript]
     
     
     
     
     


    Dan Watts

    Last modified: Mon Dec 3 15:36:39 GMT 2001