Refurbishment

Refurbishment

Some images taken mid way through the construction process showing the internal ducting and support structures for the air handling and the clean room wall panels.

These show the room before the interior was completed, the room partition has not been put in place yet.

Interior shots of the completed lab, the wet-prep area used for cleaning samples. Ultra-clean and mains water supplies are shown and a local extractor.

The main lab area, empty at the moment, with laminar flow hoods for preparing samples before testing . The laminar flow hoods ensure that samples are entirely dust free before being tested.

This image shows an area in the lab which can be sectioned off to reduce ambient light.

Contact Liam Cunningham